Travel Centre, Falun

Thermotech has delivered complete snow melting system to Falun Travel Center on an area of ​​8,500 m2.

Picture: Thermotech

About the project

Snow melting system has been installed outside the Travel Center in Falun on an area of ​​8,500 sqm and also in stairs and ramps.

 

Thermotech´s delivery

Thermotech delivered a complete snow melting system with pipes, group manifolds of dimension 160 mm, 8 manifolds installed in ground, in different dimensions depending on the lengths of the pipes vary, as well as 2 ground sensors and thermostats. Snow melting system was also installed in stairs and ramps where 6 industrial distributors were used.

 

Falu Travel Center - a summary

Type of project
Snow melting system

Thermotech´s delivery

  • Snow melting pipes
  • Group manifold dim 160 mm
  • 1 manifold installed in ground dim 160 mm
  • 1 manifold installed in ground dim 110 mm
  • 6 manifold installed in ground dim 75 mm
  • 2 ground sensors and thermostats
  • 6 industrial manifolds

 

Installer
Caverion

Area
8.500 sqm

Pictures: Thermotech